You are using an outdated browser. For a faster, safer browsing experience, upgrade for free today.

Loading...

179D Pre-Qualification


Lighting

Full set of lighting plans used for new construction or retrofit

Or

    Detailed Scope of Work including the following information:


  • Type of building. (Usage)
  • Approximate SF of building
  • Total count of fixtures per type
  • Bi-Level switching description (motion sensors, etc.)

HVAC

Full set of mechanical plans used for new construction or retrofit

Or

    Detailed Scope of Work including the following information:

  • Provide model #’s for new equipment. (Boilers, A.C.’s etc.…)
  • Description of control system energy savings features
  • Are there economizers, DOAU’s, ERV’s, HRV’s, etc.…. ?
  • Is there any kind of heat recovery units?
  • Brief description of any other energy-saving systems.

BUILDING ENVELOPE


Full set of architectural and structural plan used for construction

Or

    Detailed Scope of Work including the following information:

    If the following components have been retrofitted provide:

  • Insulation type, R-Value
  • Window U-Values, SHGC or SC
  • Tint % Solar and UV reflectance or equivalent SHGC
  • Conductive properties of paint or coatings used
  • Were any of the following installed?
  • Thermal or radiant barriers, IRCC
  • Were window locations changed to optimize day-lighting and/or solar heat gain?
  • Please click here to send full architectural drawings